1st Containers Have Arrived!
Exciting Times!!! The first floor containers have arrived.
The containers are prepped with insulation on the bottom. The welders will be on site to start prepping containers and foundation for placement. The cranes arrive next week to place the next two containers for the 2nd floor spaces.
The weather has been a little bit of a challenge trying to work with the units outdoors. There is some more prep that needs to happen before we bring the crane in. If the weather holds out, we should be dry enough to crane is the 2nd floor next week.
We’ll keep you posted. Were gathering photos and videos for our next episode. Stay tuned.